PM Gati Shakti Scheme 2024 Updates UPSC: A Comprehensive Guide for Aspirants

Please follow and like us:

“Master PM Gati Shakti Scheme 2024 Updates UPSC: Your Ultimate Guide to Ace Competitive Exams”

Introduction

The PM Gati Shakti scheme 2024 updates UPSC is a critical topic for aspirants preparing for the Union Public Service Commission (UPSC) and other competitive exams. Launched in October 2021 by Prime Minister Narendra Modi, the PM Gati Shakti – National Master Plan for Multi-modal Connectivity is a transformative initiative aimed at revolutionizing India’s infrastructure landscape. With a focus on integrated planning, seamless connectivity, and reduced logistics costs, the scheme aligns with India’s vision of becoming a $5 trillion economy. For UPSC aspirants, understanding this scheme is essential, as it frequently appears in General Studies (GS) Papers II (Governance) and III (Economy and Infrastructure).

What is the PM Gati Shakti Scheme?

The PM Gati Shakti scheme, also known as the National Master Plan for Multi-modal Connectivity, is a Rs. 100 lakh crore initiative to enhance India’s infrastructure through coordinated planning and execution. Announced on August 15, 2021, and formally launched on October 13, 2021, it aims to integrate 16 ministries, including Railways, Roadways, and Ports, to ensure seamless connectivity for goods, services, and people. The scheme subsumes the Rs. 110 lakh crore National Infrastructure Pipeline (NIP) launched in 2019, making it a cornerstone of India’s infrastructure strategy.

Objectives

  • Reduce Logistics Costs: Lower logistics costs from 13-14% of GDP to 8-9% to boost export competitiveness.
  • Enhance Connectivity: Provide multi-modal connectivity to over 1,200 industrial clusters and economic zones.
  • Create Jobs: Expedite infrastructure projects to generate employment opportunities.
  • Improve Efficiency: Streamline project execution through real-time coordination and data-driven planning.
  • Boost Trade: Increase cargo handling capacity and reduce port turnaround times.

Six Pillars

The scheme rests on six pillars:

  1. Comprehensiveness: Integrates all existing and planned initiatives across ministries.
  2. Prioritization: Enables departments to prioritize projects via cross-sectoral interactions.
  3. Optimization: Identifies critical gaps to optimize resource allocation.
  4. Synchronization: Eliminates silos by fostering inter-ministerial coordination.
  5. Analytical: Uses GIS-based tools with 200+ data layers for informed decision-making.
  6. Dynamic: Provides real-time project monitoring through satellite imagery and a centralized portal.

Key Components

  • Digital Platform: A GIS-based portal with over 1,600 data layers for planning and monitoring.
  • Network Planning Group (NPG): Synchronizes efforts across ministries to eliminate silos.
  • Unified Logistics Interface Platform (ULIP): Enhances logistics efficiency and transparency.
  • Gati Shakti Sanchar Portal: Streamlines Right of Way (RoW) approvals for telecom infrastructure.

PM Gati Shakti Scheme 2024 Updates

As of October 2024, the PM Gati Shakti scheme has completed three years, marking significant milestones in India’s infrastructure development. Below are the latest updates, sourced from credible government and educational platforms:

1. District-Level Integration

The scheme is extending to the district level through the District Master Plan (DMP) portal, set to be fully rolled out by March 31, 2025. A beta version has been tested in 28 aspirational districts, enabling local authorities to identify infrastructure gaps and collaborate on project planning. This move ensures last-mile connectivity and aligns with the scheme’s vision of inclusive growth.

2. Data Integration

The National Master Plan (NMP) has onboarded 44 Central Ministries and 36 States/UTs, integrating 1,614 data layers for real-time decision-making. A three-tier Standard Operating Procedure (SOP) ensures data accuracy, enhancing project monitoring and assessment.

3. Infrastructure Milestones

  • Roads: The Ministry of Road Transport and Highways (MoRTH) has planned over 8,891 km of roads using the NMP.
  • Railways: The Ministry of Railways has mapped 27,000 km of railway lines, with 400 projects planned in 2024 alone.
  • Ports and Shipping: 101 projects worth Rs. 60,872 crore are under development to boost cargo handling capacity.
  • Telecom: The Gati Shakti Sanchar Portal has processed over 211,000 RoW applications, supporting the rapid rollout of 5G services.

4. Budgetary Support

The Interim Budget 2024-25 announced three new railway corridors under the PM Gati Shakti framework to enhance freight efficiency and reduce logistics costs. Additionally, Rs. 75,000 crore was allocated for 100 critical infrastructure projects in FY24.

5. Green and Sustainable Infrastructure

The scheme emphasizes smart green solutions, aligning with India’s climate goals. Projects like the Green Energy Corridor and sustainable logistics networks are prioritized to promote environmental responsibility.

6. International Outreach

India is promoting the PM Gati Shakti model globally, encouraging neighboring countries to adopt its geospatial technology for integrated infrastructure planning. Non-government players are also granted access to non-sensitive data to foster public-private partnerships (PPPs).

7. Skill Development

The Ministry of Skill Development and Entrepreneurship is leveraging the scheme to establish training institutes near industrial clusters, enhancing vocational training and job creation.

Relevance to UPSC

The PM Gati Shakti scheme is a high-priority topic for UPSC aspirants, appearing in:

  • GS Paper II (Governance): Focuses on inter-ministerial coordination, regulatory approvals, and governance reforms.
  • GS Paper III (Economy and Infrastructure): Covers infrastructure development, logistics efficiency, and economic growth.

Why It Matters

  • Current Affairs: The scheme’s 2024 updates are frequently featured in PIB releases and editorials, making it a hot topic for prelims and mains.
  • Essay Paper: Questions on infrastructure-led growth or multi-modal connectivity may draw on the scheme.
  • Interview: Aspirants may be asked about the scheme’s impact on India’s economic goals.

Key Areas to Study

  • Objectives and Pillars: Understand the scheme’s core components and six pillars.
  • Recent Developments: Stay updated on 2024 milestones, such as the DMP portal and railway corridors.
  • Challenges: Analyze implementation hurdles like land acquisition and funding.
  • Economic Impact: Study how reduced logistics costs contribute to GDP growth.
  • Global Context: Explore the scheme’s potential to position India as a logistics hub.

Challenges and Criticisms

Despite its transformative potential, the PM Gati Shakti scheme faces several challenges, which UPSC aspirants should critically analyze:

1. Inter-Ministerial Coordination

Ministries often work in silos, leading to delays and resource conflicts. For instance, projects under Bharatmala and Sagarmala have faced coordination issues due to misaligned priorities.

2. Data Accuracy

While 1,614 data layers have been integrated, outdated or incomplete data, particularly land records, slows down project execution. Only 13 states have fully digitized land records, creating bottlenecks.

3. Regulatory Bottlenecks

Environmental and land clearances remain time-consuming, delaying critical projects. Streamlining approvals through GIS-based tools is a work in progress.

4. Funding Constraints

The scheme’s ambitious scale requires significant private investment. The Economic Survey 2020-21 estimated a need for Rs. 4.5 lakh crore annually from the private sector, but low credit offtake remains a challenge.

5. Environmental Concerns

Large-scale infrastructure projects face opposition from environmental activists and local communities due to potential habitat displacement and ecological impact.

Expert Critique

Swathi Satish, a content writer at ClearIAS, notes, “PM Gati Shakti is a step in the right direction, but it must address structural and macroeconomic stability concerns arising from high public expenditure. A stable regulatory framework is crucial for long-term success.”

Case Studies and Examples

1. Electronic Detail Route Survey (DRS)

The Ministry of Petroleum and Natural Gas reduced the time for creating Detail Route Survey reports from 6-9 months to just one day using electronic methods under the PM Gati Shakti platform. This efficiency saved costs and accelerated project timelines.

2. 5G Rollout

The Gati Shakti Sanchar Portal, launched in May 2022, has processed over 211,000 RoW applications, enabling the rapid deployment of 5G services across India by October 2024.

3. Railway Projects

The Ministry of Railways used the NMP to plan 27,000 km of railway lines, including 400 projects in 2024. This has improved freight efficiency and reduced logistics costs, aligning with the scheme’s goals.

Expert Insights

  • Piyush, StudyIQ: “The PM Gati Shakti initiative represents a landmark transformation in India’s infrastructure development approach. By integrating multi-modal transport and leveraging data-driven strategies, it positions India as a global logistics hub.”
  • Vision IAS: “The scheme’s use of geospatial intelligence and real-time data ensures smarter planning and monitoring, making it a game-changer for infrastructure projects.”
  • Drishti IAS: “While the scheme has made significant strides, addressing structural challenges like land acquisition and funding is critical for its long-term success.”

Preparation Tips for UPSC Aspirants

  1. Read Official Sources: Refer to pib.gov.in, pmgatishakti.gov.in, and the Economic Survey 2024-25 for accurate data.
  2. Follow Current Affairs: Track updates through reputed platforms like Drishti IAS, ClearIAS, and Vision IAS.
  3. Make Notes: Summarize objectives, pillars, updates, and challenges in a concise format.
  4. Practice Answer Writing: Write mains answers on topics like “How does PM Gati Shakti contribute to India’s economic growth?” or “Discuss the challenges in implementing the PM Gati Shakti scheme.”
  5. Use Diagrams: Include flowcharts or maps in your answers to illustrate multi-modal connectivity.
  6. Stay Updated: Monitor budget announcements and PIB releases for new developments.
  7. Join Study Groups: Discuss the scheme with peers to gain diverse perspectives.

Conclusion

The PM Gati Shakti scheme 2024 updates UPSC is a pivotal topic for aspirants aiming to excel in competitive exams. With its focus on multi-modal connectivity, reduced logistics costs, and integrated planning, the scheme is transforming India’s infrastructure landscape. The 2024 updates, including the DMP portal, railway corridors, and 5G rollout, highlight its progress and relevance. However, challenges like coordination issues and funding constraints require critical analysis. By studying official sources, practicing answer writing, and staying updated, UPSC aspirants can master this topic. Share your thoughts in the comments below, and subscribe for more UPSC preparation tips!

FAQs

1. What is the PM Gati Shakti scheme?

The PM Gati Shakti scheme is a Rs. 100 lakh crore National Master Plan for Multi-modal Connectivity, launched in October 2021 to integrate 16 ministries for coordinated infrastructure development, aiming to reduce logistics costs and enhance connectivity.

2. Why is PM Gati Shakti important for UPSC?

The scheme is a key topic in GS Papers II and III, covering governance, infrastructure, and economic growth. Its frequent mention in current affairs and budget announcements makes it essential for prelims, mains, and interviews.

3. What are the 2024 updates for PM Gati Shakti?

Key updates include the District Master Plan portal rollout by March 2025, integration of 1,614 data layers, planning of 8,891 km of roads and 27,000 km of railway lines, and support for 5G rollout via the Gati Shakti Sanchar Portal.

4. What are the challenges of the PM Gati Shakti scheme?

Challenges include inter-ministerial coordination issues, outdated data, regulatory bottlenecks, funding constraints, and environmental concerns.

5. How can UPSC aspirants prepare for this topic?

Read official sources like pib.gov.in, follow current affairs, make concise notes, practice answer writing, and use diagrams to illustrate concepts.

Disclaimer

The information provided in this article is based on credible sources, including government portals and educational platforms, as of May 13, 2025. While every effort has been made to ensure accuracy, aspirants are encouraged to verify details from official sources for exam preparation. This article is for informational purposes only and does not guarantee exam success.

Also Read: INS Vikrant Indigenous Technology: A Milestone in India’s Naval Self-Reliance

Please follow and like us:
0 Shares
Share
Pin
Tweet
Share